Projects
Asbestos Removal Projects
Asbestos Removal, Decontamination and Resheeting: Orica Stores Building (2 images)
Typical Industrial Work for HTS.
BEFORE

AFTER

Asbestos Removal, Decontamination and Resheeting: Large Industrial Warehouse, Orica
Stage 1: Asbestos wall and roof replacement


Stage 2: Replacement of Asbestos Walls, Roof, Wall Vents & Whirlybirds 4,500sq.m

Removal of Asbestos Roof, Refurbished Steel Work and Installed New Roof: Large Industrial Warehouse

HMAS Tobruk – Excellent result
Mounted on asbestos wall panels all instruments, communication equipment, separate power systems, fire services, fire alarms, fibre optic cables all had to be removed, the Asbestos wall panels replaced and then all items returned to the exact coordinates on completion.




HTS removed all the services from either side of the single skin wall panel (asbestos) before reconstructing the walls and replacing all services.


The HMAS left the dock on time – 14 days after HTS had started work.


Engineered Demolition Projects
Orica Bagged Products Building: Removing Redundant Feed Conveyor (2 images)


Engineered Demolition - Where timing was of the essence... (6 images)
Cottage Creek Bridge, Newcastle (tidal) - Incoming tide

Cottage Creek Bridge Newcastle (tidal) - Full tide

Cottage Creek Bridge Newcastle (tidal) - Outgoing tide

Cottage Creek Bridge Newcastle (tidal) - Low tide

Cottage Creek Bridge Newcastle (tidal) - Critical Timing at low tide

Cottage Creek Bridge Newcastle - As the tide comes back in - the work is complete!

Other Major Demolition Projects
KELSO - 10,000 tonne fire damaged high school demolished in 3 weeks, including decontaminating and sorting materials. (6 images) (Project Managed by Geoff Daley)






4 Rail overpasses demolished in 2 days between scheduled trains on the Dungog Line (2 images).


OneSteel Bar Mill Cooling Tower Demolition (2 images)


Technically Challenging
HTS install a state of the art environmental monitoring system for Hawkesbury, University of Western Sydney.
Working closely with S-Squared to design and build a Carbon Dioxide monitoring system involving the construction of giant metal structures in the bush near the University's Richmond campus.

Telegraph article with the science project underway.

Installing the foundations for one of the giant rings.

Aerial view of the structures nearing completion.
Blue Circle Southern Cement contracted Geoff Daley to demolish the silos at the Wyee Rail Siding.
Working closely with S-Squared to design and build a Carbon Dioxide monitoring system involving the construction of giant metal structures in the bush near the University's Richmond campus.

Telegraph article with the science project underway.

Installing the foundations for one of the giant rings.

Aerial view of the structures nearing completion.
Blue Circle Southern Cement contracted Geoff Daley to demolish the silos at the Wyee Rail Siding.
Working around 1,500VDC - 11KV – 415V – 66 KV power lines, school children, commuter traffic, local residents and the main north rail line the team. Geoff and his team were able to demolish the silos and reconstruct the road pavement, install new curb and guttering as well as rehabilitate the site (4 images).




HTS replace virtually inaccessible windows from a Mobile Elevating Work Platform (MEWP)

Double crane lift engineered by HTS

HTS organised a triple crane lift for the project dismantling Burwood Poppet Head


OneSteel REM's building Galbestos ridge vent replacement.
This ridge was leaking badly (and between much larger buildings). 2 images.


Site Remediation
Energy Australia Site, Morisset, NSW

After site remediation and spray grassing

Civil Works - Ashpalting and Concreting
Subsoil Drainage Installation, NSW
HTS recently installed subsoil drains in dirt, rock and under roads to reduce damage to road surfaces caused by ground water. The project involved the use of excavators and trenching machines to cut the trenches. The trenches were then filled with the drain pipe and aggregate, before asphalting and lanscaping.

Trenching Machine

Trenching Machine cutting a road crossing for sub soil drainage

Sub Soil Drainage Trench

Sub Soil Drain Installation

Installation of drainage pit for under road crossing

Under road drainage installation

Compacting road base over under road drainage
HTS recently installed subsoil drains in dirt, rock and under roads to reduce damage to road surfaces caused by ground water. The project involved the use of excavators and trenching machines to cut the trenches. The trenches were then filled with the drain pipe and aggregate, before asphalting and lanscaping.

Trenching Machine

Trenching Machine cutting a road crossing for sub soil drainage

Sub Soil Drainage Trench

Sub Soil Drain Installation

Installation of drainage pit for under road crossing

Under road drainage installation

Compacting road base over under road drainage