Asbestos Removal, Demolition, Asphalting & Concreting, Roofing, Soil Remediation & Other Technical Services. Phone (02) 49 600 144

Projects

Asbestos Removal Projects

Asbestos Removal, Decontamination and Resheeting: Orica Stores Building (2 images)
Typical Industrial Work for HTS.
BEFORE
Orica Stores Building_Asbestos Removal - Before
AFTER
Orica Stores Building_Asbestos Removal - After
Asbestos Removal, Decontamination and Resheeting: Large Industrial Warehouse, Orica
Stage 1: Asbestos wall and roof replacement
Asbestos Removal, Decontamination and Resheeting - Orica (Stage 1)
Asbestos Removal, Decontamination and Resheeting - Orica (Stage 1 - Image 2)
Stage 2: Replacement of Asbestos Walls, Roof, Wall Vents & Whirlybirds 4,500sq.m
Asbestos Removal, Decontamination and Resheeting - Orica (Stage 2)
Removal of Asbestos Roof, Refurbished Steel Work and Installed New Roof: Large Industrial Warehouse
Asbestos Roof removal, refurb steel work and install of new roof

HMAS Tobruk – Excellent result

Mounted on asbestos wall panels all instruments, communication equipment, separate power systems, fire services, fire alarms, fibre optic cables all had to be removed, the Asbestos wall panels replaced and then all items returned to the exact coordinates on completion.
HMAS Tobruk - Asbestos Removal - Image 1
HMAS Tobruk - Asbestos Removal - Image 2
HMAS Tobruk - Asbestos Removal - Image 3
HMAS Tobruk - Asbestos Removal - Image 4
HTS removed all the services from either side of the single skin wall panel (asbestos) before reconstructing the walls and replacing all services.
HMAS Tobruk - Asbestos Removal - Image 5
HMAS Tobruk - Asbestos Removal - Image 6
The HMAS left the dock on time – 14 days after HTS had started work.
HMAS Tobruk - Asbestos Removal - Image 7
HMAS Tobruk - Asbestos Removal - Image 8

Engineered Demolition Projects

Orica Bagged Products Building: Removing Redundant Feed Conveyor (2 images)
Engineered Demolition - Removing Redundant Feed Conveyor - Image 1
Engineered Demolition - Removing Redundant Feed Conveyor - Image 2

Engineered Demolition - Where timing was of the essence... (6 images)

Cottage Creek Bridge, Newcastle (tidal) - Incoming tide
Cottage Creek Bridge Newcastle - Incoming Tide
Cottage Creek Bridge Newcastle (tidal) - Full tide
Cottage Creek Bridge Newcastle - High Tide
Cottage Creek  Bridge Newcastle (tidal) - Outgoing tide
Cottage Creek Bridge Newcastle - Outgoing Tide
Cottage Creek Bridge Newcastle (tidal) - Low tide
Cottage Creek Bridge Newcastle - Low Tide
Cottage Creek Bridge Newcastle (tidal) - Critical Timing at low tide
Cottage Creek Bridge Newcastle - Critical Timing
Cottage Creek Bridge Newcastle - As the tide comes back in - the work is complete!
Cottage Creek Bridge Newcastle - And the job is complete!

Other Major Demolition Projects

KELSO - 10,000 tonne fire damaged high school demolished in 3 weeks, including decontaminating and sorting materials. (6 images) (Project Managed by Geoff Daley)
Kelso - Demolition and decontamination of fire damaged school - Image 1
Kelso - Demolition and decontamination of fire damaged school - Image 2
Kelso - Demolition and decontamination of fire damaged school - Image 3
Kelso - Demolition and decontamination of fire damaged school - Image 4
Kelso - Demolition and decontamination of fire damaged school - Image 5
Kelso - Demolition and decontamination of fire damaged school - Image 6
4 Rail overpasses demolished in 2 days between scheduled trains on the Dungog Line (2 images).
4 Rail Overpasses Demolished- Dungog Line - Image 1
4 Rail Overpasses Demolished- Dungog Line - Image 2
OneSteel Bar Mill Cooling Tower Demolition (2 images)
OneSteel Bar Mill Cooling Tower Demolition - Image 1
OneSteel Bar Mill Cooling Tower Demolition - Image 2

Technically Challenging

HTS install a state of the art environmental monitoring system for Hawkesbury, University of Western Sydney.
Working closely with S-Squared to design and build a Carbon Dioxide monitoring system involving the construction of giant metal structures in the bush near the University's Richmond campus.


Article about the construction project
Telegraph article with the science project underway.

Installing the foundations
Installing the foundations for one of the giant rings.


Engineering project Sydney, NSW
Aerial view of the structures nearing completion.

Blue Circle Southern Cement contracted Geoff Daley to demolish the silos at the Wyee Rail Siding.
Working around 1,500VDC  - 11KV  –  415V  –  66 KV power lines, school children, commuter traffic, local residents and the main north rail line the team. Geoff and his team were able to demolish the silos and reconstruct the road pavement, install new curb and guttering as well as rehabilitate the site (4 images).
Demolition and Rehabilitation at Wyee Rail Siding - Image 1
Demolition and Rehabilitation at Wyee Rail Siding - Image 2
Demolition and Rehabilitation at Wyee Rail Siding - Image 3
Demolition and Rehabilitation at Wyee Rail Siding - Image 4
HTS replace virtually inaccessible windows from a Mobile Elevating Work Platform (MEWP)
Replacing Windows - Technically Challenging
Double crane lift engineered by HTS
Double Crane Lift

HTS organised a triple crane lift for the project dismantling Burwood Poppet Head
Triple Crane Lift - Burwood Poppet Head - Image 1
Triple Crane Lift - Burwood Poppet Head - Image 2
OneSteel REM's building Galbestos ridge vent replacement.
This ridge was leaking badly (and between much larger buildings). 2 images.
Ridge Vent Replacement - Image 1
Ridge Vent Replacement - Image 2

Site Remediation

Energy Australia Site, Morisset, NSW
Energy Australia Site Remediation - Image 1
After site remediation and spray grassing
Energy Australia Site Remediation - Image 2

Civil Works - Ashpalting and Concreting 

Subsoil Drainage Installation, NSW

HTS recently installed subsoil drains in dirt, rock and under roads to reduce damage to road surfaces caused by ground water. The project involved the use of excavators and trenching machines to cut the trenches. The trenches were then filled with the drain pipe and aggregate, before asphalting and lanscaping.
Trenching Machine
Trenching Machine
Tenching Machine cutting a road crossing
Trenching Machine cutting a road crossing for sub soil drainage
Sub Soil Drainage Trench - Trenching Machine
Sub Soil Drainage Trench
Sub Soil Drain Installation
Sub Soil Drain Installation
Installation of Drainage Pit for road crossing
Installation of drainage pit for under road crossing
Excavator with hammer, trenching road crossing
Under road drainage installation
Compacting Road Base prior to asphalting
Compacting road base over under road drainage